Case study

Case study: planning and water in Greater Banjul

FDFatou DiopESIA & environment lead

7 min read

A low-lying, densely populated coastal area, Greater Banjul combines planning, sanitation and climate-vulnerability challenges. An integrated reading of the territory.

Greater Banjul concentrates population and activity on a low coastal territory, exposed to flooding, sea-level rise and pressure on aquifers alike.

An integrated reading

Cross-referencing hydrology, land use and networks identifies priority areas and avoids planning decisions that would worsen vulnerability.

  • Floodplain mapping
  • Coastal-aquifer and salinity diagnosis
  • Land-use analysis by remote sensing
  • Prioritisation of intervention areas
Land-sea interface: the coast demands cautious planning.
Land-sea interface: the coast demands cautious planning.

Operational recommendations

The study leads to concrete guidance: preserve natural outlets, control the urbanisation of low-lying areas and integrate water very early in projects.

Shared governance

Greater Banjul cannot be managed in isolated sectors: water, sanitation and planning are intimately linked there. Shared governance, built on common data and a cross-border reading of the West African coast, underpins the sustainability of developments.

#Gambie#Banjul#Aménagement#Littoral#Assainissement
Share
FDByFatou DiopESIA & environment lead
Keep reading

Related articles

All articles